See Legal Notices for important information on the climate-related content on this website.

Resources

Learn more about Coastal GasLink

Find videos, photos, fact sheets and more below.

Photos

cgl cable crane hill 1200x800.jpg

Coastal GasLink installed approximately 1,400 meters of pipe this summer across what the project calls Cable Crane Hill in Section 8.

Download

cgl-cable-crane-hill-section-8w-1920x1080

Crews in Section 7 of Coastal GasLink inspect a stream this summer. Reclamation activities across parts of the Coastal GasLink project route are underway to bring the land as close to its original state as possible.

Download

cgl-headwall-1920x1080

Coastal GasLink traverses the Headwall, one of the project’s steepest slopes in the Rocky Mountains. The 670-kilometer project route crosses some of the most challenging terrain in Canada.

Download

cgl-icy-pass-1920x1080

Coastal GasLink crews worked alongside year-round run-off channels, in extreme weather and with access limitations at Icy Pass, the route's highest point at 1,428 metres above sea level

Download

cgl-morice-microtunnel-1920x1080

Coastal GasLink has safely completed 800 water crossings across the project route, including micro-tunneling at the Morice River.

Download

cgl-raised-bore-outside-1920x1080

Coastal GasLink used high-quality steel and state-of-the art welding techniques and applied a corrosion-resistant coating to the pipeline, making safety a priority across design, construction and into operations.

Download

cgl-raised-bore-inside-1920x1080

Coastal GasLink utilized a raised bore to install the pipeline, a first for a pipeline project in Canada. This innovative method expedited construction, enhanced safety, and minimized the impact on the slope in this challenging terrain.

Download

cgl-wilde-lake-completion-1920x1080

The Wilde Lake Compressor Station serves as the starting point for the 670-kilometre natural gas pipeline in eastern British Columbia

Download

cgl-final-weld-1920x1080

The final weld on the Coastal GasLink project, marking 100% pipe installation, completed at the bottom of Cable Crane Hill in October 2023.

Download

Videos

Energy Transition 
Environmental Stewardship
Jobs, opportunity and community
Indigenous support and partnerships
Project progress

Coastal GasLink Connector

Read the latest and past issues of Coastal GasLink Connector newsletter.

Filter by

Construction news

View construction updates and notifications on the Construction page.